Public Water System Plan Review
Our reviews are based upon the requirements in the TCEQ’s “Rules and Regulations for Public Water Systems,” 30 TAC Chapter 290.38 through 290.47. You can view these rules online, or, if you prefer, a copy of Chapter 290 can be downloaded. You can also download any of our checklists and forms.

Submittals of Plans and Specifications for Water System

Please submit ONLY ONE of each of the following for plan review and approval:

  • Cover letter with engineering report
  • Submittal form
  • TCEQ Core Data Form (for new systems)
  • Click here for Form and Instructions
  • Sealed engineering plans and specifications
  • Well completion data
PLEASE MAIL to:
Utilities Technical Review Team
Water Supply Division MC -153
TCEQ
P.O. Box 13087
Austin, Texas 78711-3087

Hot Image When Is a TCEQ Review NOT Required?

Please note that for certain distribution systems, our rules do NOT require the submittal of engineering plans and specifications. Review and approval MAY be required for those projects that are defined by Section 290.39(j)(1)(D) as a significant change in an existing distribution system that would add more than 10% of the existing connections or 250 connections whichever is smaller. The TCEQ must be notified of the proposed project by a Texas professional engineer only if the distribution expansion is defined as significant. Upon request by the TCEQ, public water systems shall submit plans and specifications for the proposed changes.

If distribution system modifications are not defined as significant, TCEQ review is not required. If a TCEQ response letter is needed, a written request must be submitted to the TCEQ for those distribution projects that are defined as not significant.

Please be advised that even though the TCEQ will not review engineering materials for distribution projects that are not significant, requirements found in 30 TAC Chapter 290 must still be met in the design and installation of the waterline project.

Hot Image TCEQ Suggested Construction Notes That Will Help Expedite Plan Review Process

Status of Plan Reviews in Progress

The table of plan reviews in progress (PDF file. Help with PDF.) lists all plans that have either: (1) not been picked up for review, or (2) are currently under review. They are listed alphabetically by the name of the water system. If you have any questions, e-mail us at utildist@tceq.state.tx.us and refer to your project's log number.

Radionuclide Testing Required for Well Completion

Several areas of Texas have groundwater with elevated radionuclide levels. If you are drilling a well in a county where radionuclide testing is required, you must conduct radionuclide testing for interim approval.

For guidance on conducting this testing properly, see How to Conduct Radionuclide Testing for Well Completion Interim Approval.

Contact us if you have any questions.