Storm Water and Municipal Separate Storm Sewer Systems (MS4S)
Permits required for the discharge of storm water from small, medium, and large systems. Phase I and Phase II requirements. Waivers for qualified small systems.
|
Featured Items:
|
|
|
Municipal Separate Storm Sewer System (MS4) Discharges: Am I Regulated?
Explains which MS4s (Phase I, large and medium; Phase II, small) are required to obtain permit coverage for their storm water discharges. |
|
Topics Under This Category:
|
|
|
General Permit TXR040000 for Phase II (Small) MS4s
Requirements and steps necessary to obtain authorization for storm water discharges from small MS4s. |
|
|
Storm Water Permitting Requirements for Phase I (Medium and Large) MS4s
Explains the requirements and steps for applying for a renewal permit to authorize storm water discharges from Phase I (large and medium) MS4s as well as annual reporting and discharge monitoring report requirements. |
|
|
Storm Water Permitting Requirements for Phase II (Small) MS4s
Authorization options, control measures required, annual reporting requirements, and links to best management practices for operators of Phase II MS4s. |
|
|
Waiver Option 1 from MS4 Permitting Requirements (Small Systems Only)
Explains the waiver from the permitting requirement available to small MS4s which serve a population of less than 1,000. |
|
|
Waiver Option 2 from MS4 Permitting Requirements (Small Systems Only)
Explains the waiver from the permitting requirement available to small MS4s which serve a population of less than 10,000. |

