The TCEQ is publishing a proposed revision to permitting
replacing the current permit by rule for sawmills with a new
standard permit in the Texas Register on September 14. The standard
permit would authorize sawmills with up to 25 million board feet of
lumber production in any 12 calendar-month period and kiln drying
of lumber; require a setback of equipment and stockpiles from the
sawmill property line; and require fire control and prevention
measures.
Owners or operators can continue to operate under the existing
permit by rule until the facilities are modified. However, owners
and operators of facilities that are not modified may register
under the new standard permit to ensure that lumber drying
operations are authorized. Once the new permit is adopted,
authorization under the standard permit will be granted for new
facilities or modification of existing facilities. For those
facilities that do not qualify for the standard permit,
site-specific permitting will remain an option.
A public meeting on the proposed standard permit will be held on
October 17, at 2:00 p.m. at the Texas Commission on
Environmental Quality, Building C, Room 131E, 12100 Park 35 Circle,
in Austin. Call the TCEQ's Office of Permitting,
Remediation, and Registration, Air Permits Division, at
512-239-1250 for copies of the proposed standard permit for
sawmills or go to the TCEQ Web site at
http://www.tceq.state.tx.us/permitting/air/nav/standard.html.
Comments may also be mailed to Beecher Cameron, Texas Commission
on Environmental Quality, Office of Permitting, Remediation, and
Registration, Air Permits Division, MC 163, P.O. Box 13087, Austin,
Texas 78711-3087 or faxed to 512-239-1070. All comments should
reference the standard permit for sawmills. Comments must
be received by 5:00 p.m. on October 19. For further
information, contact Mr. Cameron at 512-239-1495. Si desea
información en Español, puede llamar al
800-687-4040.